Incorporating Data Center Flexibility into NV Energy’s 2026 Integrated Resource Plan, summary cover

Data center flexibility NV Energy case study – Phase 2 fact sheet

This summary presents Phase 2 of the Telos Energy and GridLab study of data center flexibility in NV Energy's resource planning. It tests whether the location of flexible data center load matters for capacity accreditation, then measures the resulting resource-mix and cost impacts...
View/Download

Southeast Energy Vision Key Takeaways

The Southeast region of the United States is facing increasing electricity demand, driven by new large loads such as data centers, as well as a growing population and increased electrification. In order to evaluate the opportunities for the region to reliably meet electricity demand, The Brattle Group developed a long-term resource planning model of the region...
View/Download

Southeast Energy Vision Report

The Southeast region of the United States is facing increasing electricity demand, driven by new large loads such as data centers, as well as a growing population and increased electrification...
View/Download

Understanding the linkage between transmission deliverability and resource adequacy— Report

This report summarizes results from a study that seeks to understand the linkage between transmission deliverability and resource adequacy. The collaboration between GridLab and Telos Energy was motivated by the need to answer a critical question: Do current rules for interconnecting power plants to the grid reflect how those plants contribute towards resource adequacy and help keep the lights on during periods of short supply?...
View/Download

California Affordability Press Release

More than 20 electricity experts outline seven priorities for California’s next governor, lawmakers and regulators as high power costs put growing pressure on households Sacramento, CA – September 10, 2026 – With California electricity rates roughly double the national average and affordability emerging as a top concern for voters, a coalition of leading energy policy and grid experts today released a comprehensive agenda for bringing down...
View/Download
Making California’s Electricity Cheaper

Making California’s Electricity Cheaper: An Affordability Agenda for the Golden State Report

More than 80% of Californians rank lowering bills as a top or important priority for state leaders, and the state’s elected officials have a duty to address these intertwined problems for their constituents. In response, GridLab and Energy Innovation convened a workshop of more than 20 California electricity experts to diagnose what’s causing rising costs and develop actionable policy solutions that address the scale of...
View/Download
Fact Sheet

Making California’s Electricity Cheaper: An Affordability Agenda for the Golden State Fact Sheet

This affordability agenda for California is a product of GridLab and Energy Innovation, jointly developed with input from 20 California energy experts convened to develop solutions over a two-day in-person workshop held in January 2026. These recommendations go beyond the workshop and reflect only the views of the report authors, not the workshop participants themselves. Together, these recommendations address long-term, structural barriers to rate reductions...
View/Download

Put the Money Where the MWhs Are: Why Path C and an Energy-centric Market Will Work for PJM

PJM is facing incredible stresses on its system today, which justify the holistic re-examination of its capacity market design and investment incentives beginning with the recent Powering Reliability Through Market Design (PRTMD) white paper. PJM’s paper does an excellent job of articulating the current predicament and how the region arrived here. It then raises the question of what path forward the RTO should take...
View/Download

Hiding In Plain Sight: Market Design Option To Quickly Unlock Capacity in PJM

PJM faces severe capacity shortages, high capacity market clearing prices with capacity charges of $16 Billion driven by unforeseen load growth from data centers, constrained new supply from supply chain disruption and slow interconnection, delayed capacity auctions, and lower capacity accreditation values. This paper proposes the following solutions to address PJM’s capacity challenges...
View/Download

Energy Resource Interconnection Service in the Southwest Power Pool

Energy Resource Interconnection Service is the foundational generator interconnection product created by the Federal Energy Regulatory Commission (FERC) in Order No. 2003 and incorporated into SPP’s Open Access Transmission Tariff. In practical terms, ERIS permits a generating facility to connect to the transmission system and inject energy up to the level established in its Generator Interconnection Agreement, subject to the availability of transmission capacity and...
View/Download

Unlocking California’s Flexible Load

The Opportunity. California is facing a dual challenge: sharply rising electricity rates and a rapidly evolving power grid increasingly reliant on variable renewables. This supply transition moves reliability risk beyond predictable summer peak hours into unpredictable hours year-round. Containing rate increases requires optimizing every available cost-effective tool. Flexible load can be one of those tools...
View/Download

SPP’s Consolidated Planning Process

Executive Summary: This review examines the initial SPP CPP implementation to provide assessment of the aspects that can be transferable to other planning regions. The review provides areas where the CPP is transferable with the Flex and Invest approach and should be able to be universally applied and where that would require significant regional redesign...
View/Download

Understanding the linkage between transmission deliverability and resource adequacy — Technical presentation

This slidedeck presents results from a study that seeks to understand the linkage between transmission deliverability and resource adequacy. The collaboration between GridLab and Telos Energy was motivated by the need to answer a critical question: Do current rules for interconnecting power plants to the grid reflect how those plants contribute towards resource adequacy and help keep the lights on during periods of short supply?...
View/Download

Understanding the linkage between transmission deliverability and resource adequacy — Fact Sheet

This fact sheet summarizes results from a study that seeks to understand the linkage between transmission deliverability and resource adequacy. The collaboration between GridLab and Telos Energy was motivated by the need to answer a critical question: Do current rules for interconnecting power plants to the grid reflect how those plants contribute towards resource adequacy and help keep the lights on during periods of short...
View/Download
The Texas Flex pdf image

The Texas Flex: How Connect and Manage can deliver speed to power for generation and load

ERCOT’s energy-only market traces back to the 1990s, beginning with wholesale competition furthered by Senate Bill 7 in 1999 which unbundled much of the investor-owned utility sector ahead of retail choice in 2002...
View/Download

Beyond the Power Plant: The Hidden Costs of Gas-Fired Generation

As utilities across the country rush to build new gas power plants to meet surging electricity demand from data centers, a new report from Current Energy Group (CEG) and GridLab reveals that the price tags regulators are approving systematically understate what customers will actually pay...
View/Download

California Investor Owned Utility Distribution and Transmission Cost Benchmarking

This paper compares California’s investor owned utilities’ electricity distribution and transmission costs with peer utilities in the US to understand whether California’s costs are higher on a unitized basis, and if so, how long that trend has been present...
View/Download

An Examination of Rising Electricity Costs and Rates in California

This paper examines the history of electricity rate and cost changes in California over the last 25 years. It aims to support a broader conversation on solutions that stabilize and reduce electricity costs and rates in the state...
View/Download

Data Center Load Forecast Report

While recent industry projections suggest rapid growth in electricity demand from data centers and AI, historical context and current data point to a more complex reality...
View/Download

A Vision for a Customer-Led Low Cost Power Grid

The energy industry faces an urgent challenge: unprecedented demand growth from data centers, electrification, and re-shoring is colliding with multi-year delays in bringing new supply online. This creates a fundamental tension between the speed at which we need new capacity and the energy affordability customers demand. PJM's1 recent capacity auction cleared at ceiling-level prices, and still 6.6 GW short of sufficient capacity for a 1-in-10...
View/Download

The Storage Gap Report

While Battery Energy Storage System (BESS) deployment is increasing across the U.S., growth remains concentrated in California and Texas. This report examines why Eastern markets, including PJM, MISO, and SPP, have not kept pace, identifying key regulatory and market design barriers such as interconnection delays, restrictive revenue stacking rules, and outdated planning models...
View/Download

IEEE PES Presentation

This collaboration between GridLAB and GridCo Partners offers a strategic reference for stakeholders to support alignment between technical standards and emerging grid‑modernization requirements...
View/Download

PNW Near-Term Winter Resource Adequacy

This collaboration between GridLab and Sylvan Energy Analytics examines Phase 1 of a recent resource adequacy study conducted by E3 on behalf of electric utilities in the Pacific Northwest and provides an independent analysis of winter resource adequacy risks based on the weather and hydro conditions experienced in January 2024. The study explores the potential contributions of clean resources and data center flexibility during critical...
View/Download

IEEE Standards landscape assessment

This report provides a comprehensive assessment of IEEE Standards relevant to electric distribution systems, identifying gaps and opportunities for future IEEE activities...
View/Download

Large Loads and Natural Gas Price Risk

Large loads present many unique challenges to electric power systems. Primary among them is the size of these loads. In its work across multiple states, EFG sees integrated resource plans (“IRPs”) or IRP related filings with levels of load growth that will double, triple...
View/Download

GridLab RFI Response – Accelerating Speed to Power

GridLab appreciates this opportunity to provide input on the U.S. Department of Energy’s (DOE) Accelerating Speed to Power Request for Information. GridLab is a non-profit, non-partisan, 501(c)(3) focused on identifying and overcoming the technical barriers to energy infrastructure deployment. GridLab applauds the DOE’s effort to collect stakeholder input on ways in which the department can use its authority and...
View/Download

Hawaii LNG

The State of Hawaii faces a critical decision regarding its energy infrastructure to meet the 100% Renewable Portfolio Standard (RPS) by 2045. This working paper evaluates the proposal to utilize Liquefied Natural Gas (LNG) as a transitional fuel for power generation on Oahu, specifically analyzing ‘Alternative 3A’ as presented by the Hawai’i State Energy Office (HSEO)...
View/Download

Price impact of additional renewable & BESS supply

A GridLab commissioned analysis executed by Aurora Energy Research estimates that had just a fraction (10%) of the land-based renewable and battery storage projects in PJM's existing interconnection queue been built in time for the 2026/27 delivery year...
View/Download

India weather data Questions and Answers

Through a collaboration with RMI, Tata Power, National Renewable Energy Laboratory (NREL), Electric Power Research Institute, and Vaisala, GridLab is developing datasets and tools that can support power system planning for India. This Q&A document provides answers to technical questions regarding the weather and renewable datasets beyond what is available in previously provided documentation...
View/Download

Data center flexibility NV Energy case study – fact sheet

This fact sheet provides critical insights from a study that evaluated data center flexibility in the context of resource adequacy planning using NV Energy as a case study...
View/Download

Data center flexibility NV Energy case study– report

This slidedeck summarizes a study that explores how data center flexibility could be brought into resource adequacy planning. NV Energy is used as a case study to demonstrate the proposed approach...
View/Download

Gas Turbine Cost Report

The capital costs for new gas combustion turbine (CT) and combined cycle gas turbine (CCGT) power plants in the United States have increased significantly in recent years. While anecdotes of these higher costs are becoming more common, the specific data isoften difficult to access. Much of the most current...
View/Download

GridLab India Weatherdata Webinar

Through a collaboration with RMI, Tata Power, National Renewable Energy Laboratory (NREL), Electric Power Research Institute, and Vaisala, GridLab is developing datasets and tools that can support power system planning for India...
View/Download

California Load Management Standard Avoided Distribution Grid Upgrade Study

Smarter deployment of home batteries, electric vehicle chargers, and smart thermostats can help avoid costly grid upgrades up to $13.7 billion in savings for California. The study identified that strategically harnessing distributed energy resources to meet the state’s goal of 3.5 GW of load shift by 2030 can avoid significant distribution system upgrade costs...
View/Download

Power System Analysis for Advocacy

Transmission expansion can unlock new lower cost generation, increase system reliability, and reduce pollution. For this reason, it is important for energy advocates of all types to understand and engage in their region’s transmission planning process...
View/Download

Integrating High-Performance Conductors in Long-Term Transmission Planning

In 2024, Energy Strategies, in partnership with GridWorks and GridLab, completed the Connected West study, an unprecedented long-term western US transmission plan based on high load growth and high energy system decarbonization. One of the scenarios tested in this study was a strategy based on maximizing the use of composite core or "High Performance Conductors." The techniques developed during this process were novel and this...
View/Download

Right-Sizing Future Electric Transmission Systems

To face this pivotal moment in our energy history energy system planners and regulators need to better synthesize the worlds of electric generation and transmission. This report, "Right-Sizing Future Electric Transmission Systems," highlights that while unprecedented expansion will be necessary to increase reliability, maintain affordability, and meet new loads, smarter coordinated planning could optimize this effort...
View/Download

Eastern Interconnection RA Study – Report

In this collaboration between GridLab and Telos Energy, we evaluated resource adequacy across the Eastern Interconnection using the open-source modeling platform, GridPath, and publicly available datasets. With a near-term study year of 2028, we analyzed the role of interregional transmission in mitigating loss of load risk across diverse regions under varying system conditions. The results highlight how coordinated planning and regional diversity can enhance reliability...
View/Download

Eastern Interconnection RA Study – FactSheet

This fact sheet provides critical insights from a study that evaluated resource adequacy across the Eastern Interconnection using the open-source modeling platform, GridPath. With a near-term study year of 2028, we analyzed the role of interregional transmission in mitigating loss of load risk across diverse regions under varying system conditions...
View/Download

BPA Advanced Conductors

This report provides a novel methodology for planning regional transmission system upgrades using advanced conductors (ACs) and evaluates their impact on the Bonneville Power Administration (BPA) transmission system's reliability and stability. The study highlights that reconductoring existing lines with ACs offers a cost-effective and time-saving solution to expand transmission capacity by utilizing existing infrastructure. The proposed framework is vendor-agnostic and compatible with various industry-standard transmission...
View/Download

Eastern Interconnection RA Study – ESIG Webinar slides

These slides were presented by Derek Stenclik and Sam Hostetter of Telos Energy at a webinar hosted by the Energy Systems Integration Group on July 1 2025. The material is based on a study in which resource adequacy across the Eastern Interconnection was evaluated for 2028. A primary focus of the study was to analyze the role of interregional transmission in mitigating loss of load...
View/Download

Eastern Interconnection RA Study – Slidedeck

This slidedeck summarizes a study conducted by Telos Energy in which we evaluated resource adequacy across the Eastern Interconnection using the open-source modeling platform, GridPath, and publicly available datasets. With a near-term study year of 2028, we analyzed the role of interregional transmission in mitigating loss of load risk across diverse regions under varying system conditions...
View/Download

Sylvan and GridLab_Renewables Transmission Rights

The practice of requiring long-term firm point-to-point transmission rights for new generators in the Pacific Northwest traditionally supported reliability for utilities that rely on BPA transmission, but has not adapted well to an environment with increasing penetrations of renewable resources. This paper describes reforms to planning and procurement processes Northwest utilities could pursue to make better use of the existing transmission system and their portfolios...
View/Download

Grid-Forming Battery Energy Storage Systems; Brief for Decisionmakers

Grid-Forming (GFM) Inverters GFM have received a lot of attention recently in power system organizations including NERC. The technology promises to address many of the stability issues facing the transmission system as the resource mix moves from spinning assets to inverter based resources. However, uptake of the technology has remained muted, even in the case of Battery Energy Storage Systems (BESS) where the marginal...
View/Download

Transmission Reliability Impacts of Retiring Conventional Generation

This report describes the transmission system reliability risks associated with the retirement of synchronous generators, such as coal and natural gas plants, and the shift towards inverter-based resources like solar PV and battery energy storage systems (BESS). It highlights the essential reliability services provided by synchronous generators, including frequency control, voltage stability, and short-circuit current contributions, which are crucial for maintaining a stable and reliable...
View/Download

Practical Guidance and Considerations for Large Load Interconnections

This report provides an outline of the current state of Large Load interconnections including data centers. It includes recommended questions for regulators and utilities to develop more robust interconnection processes. It also provides template data collection forms that can be used when requesting data from new large loads...
View/Download

Surplus Interconnection Report

Surplus interconnection refers to the practice of allowing new electricity supply resources to connect to the grid using the same interconnection rights that have already been allocated to existing generators.7 As outlined in the Surplus Interconnection Technical Whitepaper, hundreds of gigawatts (GW) of power plants across the United States are not fully using the interconnection service originally granted to them.8 Many fossil power plants have...
View/Download

Surplus Interconnection Service

The U.S. electric grid is facing a triple threat of rising rates, rapid demand growth, and increasing reliability risks. These issues have wide ranging impacts on the future of America’s economic growth, industrial competitiveness, and national defense. Meanwhile, there remain challenges to quickly bring enough power generation online to meet these threats and ensure the lights stay...
View/Download

Surplus Interconnection Technical Report

The power grid has emerged as the primary bottleneck to meeting growing electricity demand with low-cost clean energy. Demand for electricity—and especially clean electricity—has soared, driven by electrification in various sectors, the rise of data centers for artificial intelligence (AI), and booming investment in clean tech and domestic manufacturing. Simultaneously...
View/Download

Grid Reliability in the Clean Energy Transition

MANAGING GRID RELIABILITY IN A CHANGING WORLD Summers and winters are introducing new grid reliability risks in the form of extreme heat and cold, both exacerbated by the climate crisis.12 Heat waves cause people and businesses to crank their air conditioners for relief, spiking electricity demand and adding stress to the grid, while overheated lines and dry foliage can cause wildfires...